DAVAO DE ORO — As part of the National Irrigation Administration’s (NIA) continuing efforts to advance science-based and sustainable irrigation development, the NIA Davao de Oro Irrigation Management Office (IMO), in coordination with NIA Regional Irrigation Office (RIO) XI, successfully conducted geo-resistivity surveys for proposed Groundwater Pump Irrigation Projects (GIPs) on May 4–7, 2026.

The survey, which was led by Regional Office Geologist Mr. Mark Jastine G. Banate along with Davao de Oro IMO Senior Geodetic Engineer Engr. Windelyn C. Sanguenza, covered seven proposed groundwater pump sites/lines: Batinao Site 1 in New Bataan; Batutu Sites 1–4 in Compostela and Nabunturan; Cabidianan Site 1 in Nabunturan; and New Panay Site 1 in Magading, Nabunturan, Davao de Oro.

The technical team used an ABEM Terrameter LS 2 with a multielectrode system to measure the electrical resistivity of subsurface materials. The resulting preliminary subsurface images helped assess probable water-table depth, potential aquifer zones, and areas suitable for groundwater pump development.

Preliminary findings identified a potential water-bearing zone at approximately 25–80 meters at Batinao Site 1. Potential aquifer zones were also identified at Batutu Sites 1, 2, and 4, with recommended extraction intervals of approximately 15–40 m, 15–43 m, 20–80 m, and 75–120 m, depending on the site. Batutu Site 3 was assessed to have limited groundwater potential, with no drilling location recommended. At Cabidianan Site 1, shallow groundwater-bearing deposits were identified, although a thick clay layer may limit large-scale extraction. New Panay Site 1 likewise showed limited groundwater potential, with no drilling location recommended.

The geo-resistivity survey serves as a preliminary assessment and does not quantitatively determine the volume of groundwater available. Viable sites are recommended for step-drawdown and constant-rate pumping tests to determine groundwater yield and sustainability. The assessment also recommends securing the necessary water rights from the National Water Resources Board (NWRB) prior to groundwater development.

The surveyed areas are predominantly agricultural, with rice and coconut among the common crops. Through scientific assessment, NIA seeks to identify sites with potential for groundwater-supported irrigation and ensure that proposed GIPs are guided by sound technical evaluation—toward more efficient use of water resources and more reliable support for the farmers of Davao de Oro.

The ABEM Terrameter LS 2 is set up along the designated survey line at New Panay Site 1 in Barangay Magading, Nabunturan, Davao de Oro, as part of the site investigation and survey activities.

The survey team set up the ABEM Terrameter LS 2 equipment along the survey line at Batutu RIS Site 1, Brgy. Siocon, Compostela.

For questions and/or clarifications, you may contact:
Engr. DEXTER A. SABLAON
Regional Manager
NIA XI Regional Office
r11@nia.gov.ph